Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the td-cloud-library domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/osrcng/public_html/wp-includes/functions.php on line 6121
Enumeration begins for structures affected by Oluwatuyi/Sijuade/Idiagba road project | Ondo State Radiovision Corporation
23.6 C
Akure
Sunday, December 28, 2025
spot_img

Enumeration begins for structures affected by Oluwatuyi/Sijuade/Idiagba road project

Views

Categories

Share

Enumeration and evaluation have begun for structures affected by the ongoing dualisation project on the Oluwatuyi/Sijuade/Idiagba road in Akure.

Shola Ilesanmi reports that contractor handling road project is taking advantage of the COVID-19 lockdown to speed up the pace of work.


Warning: Undefined array key "videoType" in /home/osrcng/public_html/wp-content/plugins/Elite-video-player/includes/plugin-frontend.php on line 618