Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the td-cloud-library domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/osrcng/public_html/wp-includes/functions.php on line 6121
Akure Industrial layout crawling 30-years after creation | Ondo State Radiovision Corporation
23.6 C
Akure
Thursday, December 25, 2025
spot_img

Akure Industrial layout crawling 30-years after creation

Views

Categories

Share

The Akure Industrial layout along Ilesha-Owo expressway is still crawling many years after it was created for economic development.

OSRC’s Zaheed Aribisala in this report examines the situation at the 30-year-old industrial estate.


Warning: Undefined array key "videoType" in /home/osrcng/public_html/wp-content/plugins/Elite-video-player/includes/plugin-frontend.php on line 618