Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the td-cloud-library domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/osrcng/public_html/wp-includes/functions.php on line 6121
Ikare Township Road: dualization reaches advanced stage | Ondo State Radiovision Corporation
23.6 C
Akure
Thursday, December 25, 2025
spot_img

Ikare Township Road: dualization reaches advanced stage

Views

Categories

Share

The impact of a dual carriage way is now being felt at Ikare, headquarters of Akoko Northeast local government area following accelerated construction of the over 6.5 kilometer dualization project in the town.

OSRC’s Richard Ilesanmi who visited the ancient town, reports that the 2nd layer of the 1.4 kilometer phase 2 of the project has been completed, preparatory to final asphalt laying.


Warning: Undefined array key "videoType" in /home/osrcng/public_html/wp-content/plugins/Elite-video-player/includes/plugin-frontend.php on line 618