Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the td-cloud-library domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/osrcng/public_html/wp-includes/functions.php on line 6121
How rain is slowing down road constructions in Ondo | Ondo State Radiovision Corporation
23.6 C
Akure
Saturday, December 27, 2025
spot_img

How rain is slowing down road constructions in Ondo

Views

Categories

Share

Many ongoing road projects in Ondo state may suffer setback this rainy season as their constructions are affected by downpours. A visit of some road projects in Akure, the state capital, shows that downpours are slowing their construction work, thereby extending their delivery dates. OSRC’s Richard Ilesanmi, who visited Oda and òjòlá road dualization projects however reports that contractors are taking advantage of the little break to advance their work.

Warning: Undefined array key "videoType" in /home/osrcng/public_html/wp-content/plugins/Elite-video-player/includes/plugin-frontend.php on line 618